Abraham Baldwin Agricultural College: Precision Ag Building and Chambliss Hall
Abraham Baldwin Agricultural College
Education
Tifton, GA
June 2021 - August 2024
Abraham Baldwin Agricultural College’s (ABAC) new 28,000 square foot Precision Ag building is a pre-engineered steel structure with brick veneer. The new building enables Abraham Baldwin Agricultural College to accommodate laboratory instruction on a broad variety of large-scale modern equipment and technology in an appropriately accessible location.
Chambliss Hall is a 22,215 square foot building and is Abraham Baldwin Agricultural College’s only existing facility that supports shop and service laboratory functions for agricultural and forestry equipment. The Chambliss renovation includes a welding lab to provide enhanced spaces for smaller scale laboratory and service activities.
Services Performed
Abbeville Commissioning is performing commissioning services in the Design, Construction, and Warranty phases. The specific systems commissioned include:
- Mechanical
- HVAC Controls
- Plumbing
- Electrical